Shower is done. Toilet is in. Vanity is in. Mirrors are hung. Lights are in. Doors are up. All major projects are done.

Grouting of the shower was an effortless icing on the cake. Operational test resulted in a fully drained shower. Hot and cold water works as it should. Goof Proof shower Kit did provide a good pitch with a little finagling. But that could be operators room for improvement. Toilet sat majestically in its place with very little shimming to level.

Double sink vanity floats in the alcove to give maximum storage with sleek clean lines. Complete hidden plumbing added functionality and style.

Closet doors are hung in place. Additional walkin closet added more space or a functional study area.

A few touch ups, a little polishing and this project will be ready for the Orlando Real Estate market at the beginning of the year.