Tags

, , , , , , ,

Due to rains last evening we couldn’t quite make it before the floor store closed. I went this morning, too many choices we will take another look this evening if the rains hold out.

I want to stain the wooden ceiling before removing the tile floor. Staining a ceiling could get really messy. Today was a thorough vacuum cleaning. This ceiling vaults to a whopping 17 feet at it’s highest point, a ladder is needed to get up there. It really is a tedious task to lug a vacuum up a ladder down a ladder, move a ladder, and do it all over again. Ceiling is clean.

There was a single post supporting a major open wooden beam that separates the living and dining room. We checked the blueprints and it appears non load bearing. We will see if the roof stays up tonight.

20130611-154316.jpg

Advertisements